Business

Driving Green Construction: Tata Hitachi’s 10.5 MWp Solar Shift with AMPIN Energy Transition

Powering Progress: A Sustainable Energy Leap in Heavy Machinery Manufacturing

The current era is the time when industries are under growing pressure to adopt cleaner, greener ways of working. Moving towards renewable energy is no longer just a good-to-have, but a necessity for building a sustainable future. Recognising this, Tata Hitachi Construction Machinery (THCM), a pioneer in the construction equipment industry, has taken a bold step forward.

Partnering with AMPIN Energy Transition, Tata Hitachi is operating a 10.5 MWp solar power project at their manufacturing facility in Kharagpur, West Bengal, for 7 years. This project is not only a major milestone for the company but also a landmark for the entire eastern region of India. It stands as the largest industrial behind-the-meter solar project in the area, powering a large part of Tata Hitachi’s operations with clean, renewable energy.

Let’s give you a closer look at how this solar energy project is driving green construction and setting new standards for industrial sustainability.

A Giant Leap Towards Sustainability

Tata Hitachi Construction Machinery, a leader in the construction equipment industry, has always been committed to innovation and sustainability. Its latest step towards a greener tomorrow is the commissioning of a 10.5 MWp solar project in partnership with AMPIN Energy Transition.

Located in Kharagpur, West Bengal, this solar panel installation is a major milestone. It is the largest industrial behind-the-meter solar project in the eastern region. This means that the solar power generated is directly consumed by THCM without passing through the traditional electricity grid, making it more efficient and cost-effective.

Built in Two Strategic Phases

The massive 10.5 MWp solar panels project was carefully planned and constructed in two phases:

  • Phase 1: 5 MWp

  • Phase 2: 5.5 MWp

This phased approach ensured that the project was executed smoothly, minimising any disruptions to the plant’s operations. By splitting the project into two stages, Tata Hitachi could start reaping the benefits of solar energy early while the rest of the project was completed.

Powering 70% of Tata Hitachi’s Annual Needs

Thanks to this project, around 70% of Tata Hitachi’s total annual energy requirement at its Kharagpur facility is met through clean, renewable energy.

This is a remarkable achievement for an industrial giant that operates energy-intensive manufacturing processes. By using solar power for a major portion of its operations, THCM is not just reducing its dependence on conventional energy sources but also setting an inspiring example for the entire construction machinery sector.

Big Savings and Bigger Impact

Switching to solar energy is not just good for the environment, it is also good for business. Tata Hitachi is expected to save about 40% in energy costs because of this solar shift.

Such significant savings help the company reinvest in innovation and growth while maintaining its commitment to sustainability. In today’s competitive industrial landscape, where operational efficiency and cost management are key, renewable energy solutions like this offer a win-win situation.

Fighting Climate Change

The environmental benefits of this project are equally impressive. The solar installation is expected to mitigate over 328,000 metric tonnes of CO₂ emissions over its lifetime.

To put this into perspective, this is equivalent to planting over 525,000 trees or removing over 70,000 cars from the roads for a year! Such massive carbon savings play a vital role in India’s efforts to combat climate change and achieve its renewable energy targets.

AMPIN Energy Transition: Powering the Future

AMPIN Energy Transition, one of India’s leading renewable energy companies, has been a critical partner in this journey. Its expertise in building and managing large-scale solar projects helped bring this vision to life.

With a strong focus on sustainability, innovation, and customer-centric solutions, AMPIN Energy Transition is helping industries across the country reduce their carbon footprint and switch to greener energy sources. Its collaboration with Tata Hitachi is a testament to what can be achieved when industry leaders join hands with renewable energy experts.

Driving Change with Solar Energy

The 10.5 MWp solar project at Tata Hitachi’s Kharagpur plant is a shining example of how industries can lead the green transition. By partnering with AMPIN Energy Transition, Tata Hitachi has successfully blended environmental responsibility with business efficiency.

This project doesn’t just power machines—it powers hope for a cleaner, greener future. And as more industries follow in these footsteps, we move closer to a world where progress and the planet thrive together.

At AMPIN Energy Transition, they are proud to drive the clean energy revolution for industries, helping businesses lower their costs, meet sustainability goals, and secure a greener future.

If your organisation is ready to make the shift to renewable energy, partner with AMPIN Energy Transition and be a part of powering a cleaner, brighter tomorrow.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button